The Matt:e SP-EVCP connection centre is simple to install with unique built-in PEN fault protection; allows for the connection of EV charge points to the PME earthing facility without the use of earth electrodes. Suitable for EV chargers such as Tesla Gen 3.
PRODUCT FEATURES
- Single-phase Voltage Monitoring and Protection Unit
- No earth electrodes required
- Built in 32A DP MCB
- Suitable for Tesla Gen 3 EV Chargers
- Suitable for connection direct to tails
- Wire in and wire out
- Material: Steel IP2X enclosure
- Optional Load management with hard wired CT
- Weight: 3KG
- Dimensions: H169xW182xD111mm
- Warranty: 3 year parts