The ARD connection centre with built-in O-PEN® technology, allows for the connection of EV charge points to the PME earthing facility without the use of earth electrodes. To facilitate compliance with BS:7671. 2018 Amendment 1, 2020 Regulation 722.411.4.1.(iii). The matt:e ARD connection centre incorporates the unique 5 pole auto reset device that automatically restores power to the load once the fault has cleared.